16 March 2009
Laminates 7 and 8
75% of the spar is now glued. At this rate another two weeks to start trimming it.
05 March 2009
2nd and 3rd laminations
No i wasnt game to do two at once. Actually I have four laminations because the first gluing was between two laminations. The second added the third lamination, the third gluing added the fourth. Out of 12. 1/3 of the way through. And I've run out of big enough clamps to for the width. So I need to buy or borrow more.
M helped me with the first two gluings, and A helped with the third.
M helped me with the first two gluings, and A helped with the third.
Subscribe to:
Posts (Atom)