the other sides of rib pair 107 is gluing on the table right now. the final gluing event of the rib sequence is drying on the table and will be put with the rest of the rib stack - representing 18 wing ribs in total - all made by me - awaiting the next phase - to start in October - being the construction of the one piece spar (with the 750lb all up wt option) - then the final assembly of the wings will proceed.
i have finished my first component set and i feel like an aeroplane builder - hurray for me and plans set 352
31 March 2008